Moving on to the forward main spar carry through, these items will all attach to it and are being cleaned up or modified in these pictures.

Picture two shows a modification that wasn’t in the plans. An addendum was sent to cut a notch in some of these ribs to allow for a connector on the end of a wire bundle to be able to pass through the pre drilled hole.

The last two pictures show pieces that are used to make the pitch axis of the control stick.