Way back in January, when I last posted, I had just finished up the forward part of the fuselage and had gotten down the tail cone from its spot hanging in the garage.  I had joined the two together and bucked the initial rivets.  The first two pictures are a recap of that point.

Then it was on to the rest of the joining details. First up, get the rear spar carry through section finished up as seen in the last two pictures