The first two pictures show the gluing process and the completed table in position  with the mounted dimpler.

The third and fourth pictures show the result of sorting all the little bags of rivets and bolts.  The Sonex comes with all the rivets but no hardware, you have to source it all.  I had some containers like these that I stored all the hardware in. It was very convenient. The bulk of the Sonex rivets were kept in two containers, one for the ccp-42’s and another for the ccl-44’s. The remaining different types were kept together in labeled plastic bags in another smaller container.

I still have all of the non rivet hardware in the paper bags they came in. I will transfer them to clear plastic bags if I don’t put them in containers like these. I haven’t decided yet.

One more thing. In picture two you do not see a vertical stabilizer ready to have the skins drilled to final size.  I haven’t started yet!!! ;-)