Click on a picture to
view a larger image.

The first picture shows everything in place including pre arranged paper towels and extra sets of gloves. The second picture shows the two parts just before mixing. Once it’s mixed it has 30 minutes of working time.

The third picture shows the two ribs in the left elevator in place with the skins about to be clecoed together. The last picture shows the completed job 30 minutes later. The weights are left on for two day for curing.