After disassembly of the pieces it is debar and dimple time. The first piece shown is a strap that has one side riveted to non tank portion of the leading edge. The other side has nut plates that will attach to the tank portion of the leading edge.

The bottom two picture show some of the nut plates that need to be installed on various pieces and how I held them in place when attaching the nut plates.