|
All my tools that I needed for this build, mostly riveting related, have also come in and been inventoried. Picture one shows my C Frame dimpler. The box behind it with all the crate packing material is ready to go out for garbage pick up. I went with this dimpler after talking with several RV builders. I didn’t like the thought of whacking the simpler 30,000 times with a hammer. Next up was doing a more complete inventory. I loaded up the table with the subkits and started unwrapping them. It was all very neatly wrapped, and more importantly, all there. |