Click a photo to embiggen

I installed all of the control cables next. The center ones don’t do anything yet since they aren’t connected to anything yet, but they do go through the firewall.

The two heater vent controls are visible in the last picture next to the fresh air vents. They have been hooked to the heater vents and work well.

The second picture shows the final installation of the pitot, static and AOA lines. Blue, clear and red, respectively.

And the last picture is also the completed and fully functioning instrument panel.